In general, the decoration is a very troublesome thing. Step by step in distress, ready to fight, deceived, not liking the place to meet the eye everywhere. There are many things to regret, perfection is impossible, can only try to reduce mistakes. Everyone's situation is not the same, I talk about my experience of decoration for your reference.
Shower room decoration: bathroom renovation knowledge need to pay attention to what
One, ceiling: because the water between the bathroom is heavy, so to choose those with waterproof, anti-corrosion, anti rust characteristics of the material.
Two, the ground in the tile before, must do a good job in waterproof; tile laying, to ensure that the brick surface has a drainage slope (generally about 1% is appropriate), the slope towards the ground floor drain; must be closed water test after the completion of the laying of tiles, the time to ensure that at least 24 hours; the laying of tiles should pay attention to with tile seam and alignment, ensure the overall sense of the whole bathroom, in order to avoid clutter in the visual impression.
Three, wall: the wall tiles also need to be waterproof, and ceramic tile to ensure smooth, and with tile seam and alignment, in order to ensure the whole metope and ground; when the water supply pipe outlet, tile incision to be small, appropriate, convenient water heater on the flange cover for the incision. Perfect appearance.
Four, doors and windows: the best bathroom windows, for ventilation; if there is no window, with particular attention to the details of the door. In order to prevent the bathroom water to overflow, the door industry should be slightly higher than the bathroom inside the door and the ground; gap between the bathroom to stay a little, in order to return; if it is a sliding door, but also between the sliding door and a layer of waterproof bathroom tiles.
Five, circuit laying: cable connectors, bathroom must be hung tin, and successively wrapped waterproof tape and insulating tape, to ensure the safety of wire must be set on fire; tube; all switches and sockets must have moistureproof box, and the location also depends on the size and position of the fixed appliance, in order to ensure the convenient and reasonable.
Six, waterway reconstruction: bathroom between the water supply and drainage line is best not to make too big changes, if you want to change, according to the specific circumstances, such as washing machine type is different, the position of the water is also different.
Seven, sanitary installation: the best in the decoration before the water hole distance record, according to the size of selected bathtub, bath room, toilet, wash basin, sanitary ware, so in the decoration of the wrong size; toilet installation must use the toilet mud sealing, reoccupy expansion screws or glass glue fixed, so in the toilet, blocking for repairs.